Winkler Services Water Transmission Infrastructure
Location
Kermit, TXValue
$14 MDelivery Method
- Design-Build
Client Type
IndustrialProject Type
- Pipeline
- Pump Station
This project for Winkler Midstream LLC included the construction of a raw water pump station with two 500 hp pumps and a rated capacity of 10.5 MGD, and 62,970 LF of 24″ and 32,675 LF of 20″ PVC waterlines. The project required a 160 LF 30″ auger bore, 530 LF 24″ directional drill, 18 EA 48″ manholes, rock excavation via trenching, and an outlet discharge structure.