Garney
Slide 1
Slide 2
Slide 3
Slide 4
Slide 5
Slide 6
6561 - ECCV pump station 6561 - pump station pipes 6561 - pumps 6561 - tank ECCV RO Photos 027 1

Northern Water Supply Membrane Water Treatment Facility

East Cherry Creek Valley Water & Sanitation District selected Garney to provide a new water treatment facility. This project includes a new membrane water treatment building, reverse osmosis water treatment equipment, membrane feed pumps, ultraviolet water treatment equipment, electrical gear, I&C, and HVAC/plumbing. The project also includes the installation of new chemical tanks, chemical piping, clean-in-place tanks, pumps, a high service pump station building, and a 2.5 MG welded steel aboveground water storage reservoir, which included a concentrate storage pond and concentrate discharge pump station. The project includes upgrades to the existing Northern Booster Pump Station, including an additional booster pump, relocating existing radios from the pump station to the new water treatment facility, and upgrades to the existing Southern Booster Pump Station, including an additional booster pump.