Garney

Agricultural Ditch Rehabilitation

Coors wanted to enclose an above ground effluent flume at their brewery in Golden, Colorado. They hired Garney to replace the flume with two 54″ HDPE pipelines. The pipelines, which totaled approximately 2,300 LF, were installed in place of the flume and then covered with 15,000 CY of imported fill material. An existing sand out structure was modified at one end of the lines to transition to the dual 54″ lines. At the other end, a concrete outlet structure was constructed.