Wichita, Kansas – August 11 –
This $10.5 million project for the City of Wichita consists of installing 29,000 LF of 48", 60" and 66" polyurethane-coated steel pipe tranmission main along with small diameter PVC spur lines to an existing well system. The project also includes 66" and 84" liner-plate hand tunnels, time critical large diameter valve replacements, and existing steel surge tank demolition.